摘    要:结合目前电网运行方式,分析了哈南主变停电给电网运行带来的影响,制定了解决措施,切实保证了电网的安全稳定运行,并提出了哈南变增设第二组变压器的建议.

关 键 词:500kV变电所  运行方式  潮流计算  控制措施  供电可靠性
文章编号:1002-1663(2005)05-0354-03
收稿时间:2005-01-17
修稿时间:2005-01-17

What would happen if the main transformer failed in 500 kV Hanan substation
SUN Qianwei,YANG Xinghua. What would happen if the main transformer failed in 500 kV Hanan substation[J]. Heilongjiang Electric Power, 2005, 27(5): 354-356
Authors:SUN Qianwei  YANG Xinghua
Affiliation:1. Harbin Electric Power Design Institute, Harbin 150001, China; 2. Heilongiiang Electric Power Co. , Ltd, Harbin 150001, China
Abstract:The effect if the main transformer failed on the power grid operation was analyzed according to the power grid operation mode at present, the countermeasures to this situation were made, which will ensure the power net to run safely and steadily, and the suggestion to set up one more main transformer in Hanan substation was put forward in the paper.
Keywords:500 kV substation    operation mode    powflow calculation    control measure    reliability of power supply