首页 | 本学科首页   官方微博 | 高级检索  
     

折线形预应力梁施工质量管理
引用本文:王兆芳.折线形预应力梁施工质量管理[J].山西建筑,2010,36(28):208-209.
作者姓名:王兆芳
作者单位:江苏省建湖县职业技术教育中心,江苏建湖,224700
摘    要:以学院学术报告厅观众看台工程为例,对物资,施工方案,施工工艺,成品保护等方面具体阐述了折线形预应力梁施工质量保证措施,从而在施工过程中严把质量关,做到全面质量控制。

关 键 词:折线形预应力梁  质量保证措施  施工工艺  成品保护

Construction quality management of fold line pre-stressed beams
WANG Zhao-fang.Construction quality management of fold line pre-stressed beams[J].Shanxi Architecture,2010,36(28):208-209.
Authors:WANG Zhao-fang
Affiliation:WANG Zhao- fang
Abstract:With spectator stand in college academic hall as an example, the thesis expounds the measures for ensuring the construction quality of the fold line pre-stressed beams from aspects of materials, construction plan, technologies, finished product protection and etc., so as to strictly control the quality during the constructions and realize overall quality control.
Keywords:fold line pre-stressed beams  measures for ensuring the quality  constructional technologies  finished product protection
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号