首页 | 本学科首页   官方微博 | 高级检索  
     

武汉新火车站电梯井整体焊接工艺
引用本文:冯骏,郑军.武汉新火车站电梯井整体焊接工艺[J].钢结构,2009,24(11):68-70.
作者姓名:冯骏  郑军
作者单位:武汉一冶钢结构有限责任公司,武汉,430415
摘    要:本工程结构形式为箱型结构,施工难点在于焊接节点多、焊接方位多且大多数焊缝为全熔透焊缝,很容易产生焊接变形及裂纹。对此,首先采用焊前预热,单元件箱体采用电渣熔嘴焊和双丝双弧焊对称焊接工艺,电梯井进行整体焊接并采用多方位焊接工艺。此焊接工艺能较大地提高焊接质量及效率,有效地控制焊接成型后焊缝出现裂纹。

关 键 词:钢结构  电渣焊  裂纹  箱型结构

WELDING PROCEDURE OF WHOLE ELEVATOR WELL FOR THE WUHAN NEW RAILWAY STATION
Feng Jun,Zheng Jun.WELDING PROCEDURE OF WHOLE ELEVATOR WELL FOR THE WUHAN NEW RAILWAY STATION[J].Steel Construction,2009,24(11):68-70.
Authors:Feng Jun  Zheng Jun
Affiliation:Feng Jun Zheng Jun(Wuhan Yiye Steel Structure Co.Ltd,Wuhan 430415,China)
Abstract:The project is box structure.Its difficulty is that a lot of welded joints and directions of welding,and the most of welding is full penetration welding which is easy to occur welding deformation and crackes.As for this,firstly weld preheating is adopted,then consumable guide electroslag welding and symmetry welding of diplonema and double-arc for unit box structure are performed,the elevator shaft is welded as a whole and performed multiaspect welding,which can improve the quality and efficiency of the wel...
Keywords:steel structure  electroslag welding  crack  box structure  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号