首页 | 本学科首页   官方微博 | 高级检索  
     


A CHANCE-CONSTRAINED MODEL FOR THE OPERATION OF THE ASWAN HIGH DAM
Authors:S O DUFFUAA
Affiliation:1. Department of Systems Engineering , King Fahd University of Petroleum &2. Minerals , Dhahran, 3126J, Saudi Arabia
Abstract:This paper analyzes the problem of the operation of Aswan High Dam. A chance-Constrained Model (CCM) is developed for the operation of the Dam. The model optimizes total benefits from the discharged water while incorporating all physical and operational constraints. Zero-order decision rules are used to obtain the model deterministic equivalent. The model operating policy is compared with the current operation policy derived from a heuristic rule and an alternative policy derived from a dynamic programming model developed earlier for the operation of the Aswan High Dam. The chance-constrained approach provides a natural and more flexible model for the operation of the Dam.
Keywords:Chance-constrained programming  Aswan High Dam  operational policies
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号