首页 | 本学科首页   官方微博 | 高级检索  
     


An effective heuristic for scheduling a yard crane to handle jobs with different ready times
Authors:W C Ng  K L Mak
Affiliation:1. Department of Industrial and Manufacturing Systems Engineering , The University of Hong Kong , Pokfulam Road, Hong Kongngwc@hku.hk;3. Department of Industrial and Manufacturing Systems Engineering , The University of Hong Kong , Pokfulam Road, Hong Kong
Abstract:In land-constrained port container terminals, yard cranes are commonly used for handling containers in a container yard to load containers onto or unload containers from trucks. However, yard cranes are bulky, slow and need to move frequently between their work locations. As it is common that the container flow in a terminal is bottlenecked by yard crane operations, effective work schedules of yard cranes are needed to increase the terminal’s throughput. This article studies the problem of scheduling a yard crane to perform a given set of container handling jobs with different ready times. The objective is to minimize the sum of job waiting times. It is noted that the scheduling problem is NP-complete. This research develops a heuristic to solve the scheduling problem and an algorithm to find lower bounds for benchmarking the schedules found by the heuristic. The performance of the heuristic is evaluated by a set of test problems generated on the basis of real-life terminal operations data. Indeed, the computational results show that the proposed heuristic can find effective solutions for the scheduling problem.
Keywords:Yard crane scheduling  Container terminal  Heuristics
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号