首页 | 本学科首页   官方微博 | 高级检索  
     


Service spillway of the Kambarata No. 1 hydroelectric station
Authors:V B Rodionov  B P Lysenko  V N Mukhina  V F Korchevskii
Abstract:
1.  The use of the scheme of a tunnel spillway with dissipation of energy inside the conduit in a shaft stilling basin under conditions of the Kambarata No. 1 hydrostation makes it possible to reduce the volume of earthworks and concrete in comparison with alternative variants and to protect the downstream stretch of the river valley from collapse of the slopes and substantial erosion of the channel.
2.  Investigations confirm the efficiency, reliability, and safety of the spillway and all its components.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 13–16, September, 1989.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号