首页 | 本学科首页   官方微博 | 高级检索  
     

井震结合井旁构造随钻跟踪解释方法及其应
引用本文:李军,施泽进,陈强,陈伟中,王焕增. 井震结合井旁构造随钻跟踪解释方法及其应[J]. 石油勘探与开发, 2006, 33(3): 322-325
作者姓名:李军  施泽进  陈强  陈伟中  王焕增
作者单位:1. 长江大学教育部油气资源与勘探技术重点实验室;长江大学地球物理与石油资源学院
2. 成都理工大学能源学院
3. 上海工程技术大学计算中心
4. 中国石油塔里木油田公司
基金项目:中国石油天然气集团公司资助项目
摘    要:塔里木盆地库车山前高陡构造带的复杂性造成了地震成像的困难和解释的多解性,增大了勘探风险。在中途钻井过程中,首先利用井壁成像测井和地层倾角测井资料确定井点处构造特征,标定过井地震剖面,然后对井旁构造进行跟踪解释,确定钻井所在构造部位,判断地震构造解释真伪,分析测井井筒构造与地震构造解释产生矛盾的原因,及时对地震解释参数进行优化或为调整井位提供依据,从而最大程度地降低勘探风险。图6表1参8

关 键 词:井旁构造  倾角测井  井壁成像测井  地震  随钻跟踪解释
文章编号:1000-0747(2006)03-0322-04
收稿时间:2005-10-25
修稿时间:2005-10-252006-01-11

Tracing interpretation and prediction for geological structures of the well location during drilling using logging and seismic data and its application
LI Jun,SHI Ze-jin,CHEN Qiang,CHEN Wei-zhong,WANG Huan-zeng. Tracing interpretation and prediction for geological structures of the well location during drilling using logging and seismic data and its application[J]. Petroleum Exploration and Development, 2006, 33(3): 322-325
Authors:LI Jun  SHI Ze-jin  CHEN Qiang  CHEN Wei-zhong  WANG Huan-zeng
Affiliation:1. Ministry of Education Key Laboratory of Exploration Technologies for Oil and Gas Resources, Yangtze University, Hubei 434023, China; 2. School of Geophysics and Petroleum Resources, Yangtze University, Hubei 434023, China; 3. School of Energy Resources, Chengdu University of Technology, Sichuan 610059, China; 4. Computing Center, Shanghai University of Engineering Technology, Shanghai 200336, China; 5. PetroChina Tarim Oil field Company, Xinjiang 841000, China
Abstract:The extremely complicated geological conditions in the Kuqa foreland basin,Tarim have brought great difficulties in seismic prospecting and resulted in a high risk in oil and gas exploration.Aimed at the difficulties,a new method is put forward which include the following steps: determining geological structures based on the appropriate data-processing and geological interpretation of Dip Log and Borehole Imaging Log in the course of drilling,performing interpretation while drilling for the geological structures of the well location,predicting the well-reached local structural position by integrating logging and seismic data,analyzing the contradiction between logging well-bore and seismic structures,and timely optimizing the parameters for seismic data processing or adjusting the well position to reduce the exploration risk to the minimum level.
Keywords:geological structure of the well location   dip log   borehole imaging log   seismic data   interpretation while drilling
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《石油勘探与开发》浏览原始摘要信息
点击此处可从《石油勘探与开发》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号