建筑整体平移后桩基的设计处理
引用本文:林世明. 建筑整体平移后桩基的设计处理[J]. 土工基础, 2003, 17(3): 21-23,30
作者姓名:林世明
作者单位:福建省广播电视勘察设计所,福建,福州,350001
摘    要:某综合楼桩基施工完成后,因整幢建筑物要求平移,造成基桩整体移位。本文结合工程实例,探讨采用柱下联合承台处理桩基移位的方法。通过群桩承载力合力点的调整,采用锚杆静压桩协同受力,以经济、快速的方式,成功地解决了桩基整体大尺寸移位的问题。

关 键 词:基桩  移位  多柱联合承台  合力点  锚杆静压桩
文章编号:1004-3152(2003)03-0021-03
修稿时间:2003-01-17

The Pile-foundation Design and Disposal After the Building Translation Entirety
LIN Shi-ming. The Pile-foundation Design and Disposal After the Building Translation Entirety[J]. Soie Engineering and Foundation, 2003, 17(3): 21-23,30
Authors:LIN Shi-ming
Abstract:The pile-foundation must be translated after constructing, because of the building translated. By means of practical project, this paper explore the method using the united pile-foundations under the column to disposal of the pile-foundation translation. By readjust the join forces of the pile and apply the united force principle of the anchor static-pressure pile,the problem of the pile-foundation translation entirety has been dealt successful. And it achieve a good economic benefit.
Keywords:pile-foundation   translation   united pile-foundations   join forces   anchor   static-pressure pile  