首页 | 本学科首页   官方微博 | 高级检索  
     

低渗透油藏生产井关井测压时间的计算与应用
引用本文:田冷,何顺利,李秀生,顾岱鸿. 低渗透油藏生产井关井测压时间的计算与应用[J]. 石油勘探与开发, 2007, 34(2): 226-229
作者姓名:田冷  何顺利  李秀生  顾岱鸿
作者单位:中国石油大学(北京)石油工程教育部重点实验室
基金项目:中国石油集团公司资助项目
摘    要:低渗透油藏的生产井压裂后,在单井试油试采过程中,压力恢复测试关井时间不同,其中有些井压力恢复曲线不能出现边界反应段,渗流不能反映地层中真实流动特征。针对这种情况,基于长庆绥靖油田塞39井区长:低渗透油藏大量试井和实际生产资料,利用现代试井解释理论,研究合理关井时间的界限及其计算方法。结果表明,当油井关井测压时间达到3倍地层径向流开始出现的时间后,利用此时的压力数据解释地层参数和地层压力,其结果的误差小于5%,同时能较准确地判断边界类型。计算的理论曲线和霍纳法解释值非常接近,对于塞39井区,若预先知道某生产井地层有效渗透率值,可从理论曲线查出压力恢复试井的关井时间,否则,建议按照该井区地层有效渗透率(大约在6mD左右),将不稳定试井测试时间控制在25d以上为宜。图4表3参14

关 键 词:低渗透油藏  生产井  不稳定试井  径向流  关井测压时间
文章编号:1000-0747(2007)02-0226-04
修稿时间:2005-11-272006-11-04

Calculating method of shut-in time for pressure survey in production wells in low permeability oil reservoirs and its application
TIAN Leng,HE Shun-li,LI Xiu-sheng,GU Dai-hong. Calculating method of shut-in time for pressure survey in production wells in low permeability oil reservoirs and its application[J]. Petroleum Exploration and Development, 2007, 34(2): 226-229
Authors:TIAN Leng  HE Shun-li  LI Xiu-sheng  GU Dai-hong
Affiliation:Key Laboratory of Petroleum Engineering, Ministry of Education, China University of Petroleum, Beijing 102249, China
Abstract:The reasonable time limit of shut-in wells and its computational method for fractured wells in low permeability reservoirs were studied by the modern well test interpretation in Chang 2 low permeability oil pool of Sai 39 block in Suijing of Changqing Oilfield.The results show that when the time of shut-in pressure survey triples the occurrence time of radial flow,the error of well-testing results about the formation parameters and formation pressure gained by pressure data at this moment is smaller than 5%.The border types can be diagnosed.The theoretical curve is similar to the Horner method interpretation value.For Sai 39 block,if effective permeability is given,shut-in time for pressure survey can be obtained by the theoretical curve.Otherwise,according to the effective permeability in this block(about 6mD),it is proposed that the measuring time of transient well testing be controlled for more than 25 days.
Keywords:low permeability oil reservoir   production well   transient testing   radial flow   shut-in time for pressure survey
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《石油勘探与开发》浏览原始摘要信息
点击此处可从《石油勘探与开发》下载全文