首页 | 本学科首页   官方微博 | 高级检索  
     

对低水头河床式电站设计的体会
引用本文:曾新民.对低水头河床式电站设计的体会[J].水力发电,2005,31(9):33-35.
作者姓名:曾新民
作者单位:中水珠江规划勘测设计有限公司,广东,广州,510610
摘    要:改革开放以来,相继建设了一大批低水头河床式电站。蓄水位选择、坝址选择、枢纽布置、建筑物设计优化、施工导流与工期等是低水头河床式电站设计的重要内容。以长洲、飞来峡等水电站工程为例,对低水头河床式电站的设计进行了总结,并提出了建议。

关 键 词:低水头水电站  河床式水电站  水电站设计
文章编号:0559-9342(2005)09-0033-03
收稿时间:06 14 2005 12:00AM
修稿时间:2005-06-14

Personal understanding of design of hydropower station across river with low head
Zeng Xin-min.Personal understanding of design of hydropower station across river with low head[J].Water Power,2005,31(9):33-35.
Authors:Zeng Xin-min
Affiliation:Zhongshui Pearl River Investigation and Design Co. Ltd., Guangzhou Guangdong 510610
Abstract:Since the reform and open to the outsides, a large amount of hydropower station across river with low head have been built on after another. The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head. Taking the Changzhou and Feilaixia Hydropower Stations as examples, this paper summarizes the design of hydropower station across fiver with low head and puts forward some suggestions.
Keywords:low-head hydropower station  hydropower station across fiver  design
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号