泸定水电站粘土心墙料基础部位雨季快速填筑
引用本文:李光涛,刘春晖.泸定水电站粘土心墙料基础部位雨季快速填筑[J].水力发电,2012,38(1):65-67.
作者姓名:李光涛  刘春晖
作者单位:中国人民武装警察部队水电第三总队第九支队,四川成都,611130
摘    要:为尽早满足泸定水电站填筑高程具备第1台机组发电的目标,大坝心墙粘土必须在雨季填筑。为此,在确保填筑施工质量及安全运行的前提下,采取了快速施工方法,保证了工程进度目标的实现。

关 键 词:施工方法  快速填筑  雨季  泸定水电站

Rapid Clay Filling for the Lower Part of Core Wall in Rainy Season in Luding Hydropower Station
Li Guangtao , Liu Chunhui.Rapid Clay Filling for the Lower Part of Core Wall in Rainy Season in Luding Hydropower Station[J].Water Power,2012,38(1):65-67.
Authors:Li Guangtao  Liu Chunhui
Affiliation:(The 9th Detachment of 3rd General Contingent of Chinese People’s Armed Police Hydropower Troops, Chengdu 611130,Sichuan,China)
Abstract:In order to meet the requirement on filling height of dam and the generation of the 1st unit in Luding Hydropower Station,the clay of core wall must be filled in rainy season.The rapid construction method is used for filling the clay in the lower part of core wall after considering the requirements on construction quality and safety.The rapid filling method ensures the progress of project construction.
Keywords:construction method  rapid filling  rainy season  Luding Hydropower Station