吉沙水电站施工总布置设计
引用本文:马治国,卢军民,吴朝月,薛宝臣. 吉沙水电站施工总布置设计[J]. 水力发电, 2012, 38(3): 45-46,85
作者姓名:马治国  卢军民  吴朝月  薛宝臣
作者单位:中国水电顾问集团北京勘测设计研究院,北京,100024
摘    要:吉沙水电站为长引水式电站,主要由混凝土闸坝、水道系统和地面厂房等组成,根据枢纽布置特点及施工支洞布置方案,结合工程实际情况,并考虑其他因素,施工总布置采用集中与分散相结合的布置方式。经过施工实践检验,设计规划的施工总布置方案满足工程建设的需要。

关 键 词:施工总布置  引水隧洞  施工支洞  交通  吉沙水电站

General Construction Layout of Jisha Hydropower Station
Ma Zhiguo , Lu Junmin , Wu Chaoyue , Xue Baochen. General Construction Layout of Jisha Hydropower Station[J]. Water Power, 2012, 38(3): 45-46,85
Authors:Ma Zhiguo    Lu Junmin    Wu Chaoyue    Xue Baochen
Affiliation:(HydroChina Beijing Engineering Corporation,Beijing 100024,China)
Abstract:Jisha Hydropower Station project has a long water diversion system,and is mainly consisted of concrete gate dam,water diversion system and ground powerhouse.According to project characteristics and adit arrangement program,and by considering other factors,the general construction layout is an integration of centralization and decentralization.The actual construction shows that the general layout scheme can meet the requirements.
Keywords:general construction arrangement  diversion tunnel  adit  traffic  Jisha Hydropower Staion