鞍钢东鞍山烧结厂360m2烧结机骨架的安装和调整
引用本文:覃道苏. 鞍钢东鞍山烧结厂360m2烧结机骨架的安装和调整[J]. 烧结球团, 2002, 27(5): 23-26
作者姓名:覃道苏
作者单位:长沙冶金设计研究院
摘    要:介绍了东鞍山烧结厂360m^2烧结机骨架的安装和调试过程,包括:基准点、水准点及中心线的设定;骨架底板的安装和检测等。

关 键 词:调整 烧结机骨架 骨架底板 安装 基准点 中心线
修稿时间:2002-06-03

INSTALLATION AND ADJUSTMENT OF SUPPORTING RFAME OF 360m2 SINTERING MACHINE IN DONGANSHEN SINTERING PLANT
Qin Daosu. INSTALLATION AND ADJUSTMENT OF SUPPORTING RFAME OF 360m2 SINTERING MACHINE IN DONGANSHEN SINTERING PLANT[J]. Sintering and Pelletizing, 2002, 27(5): 23-26
Authors:Qin Daosu
Abstract:The installation of supporting frame of 360m 2 sintering machine in DONGANSHEN sintering plant included the settings of all base points and centrelines,the mounting and detecting of different position frames etc were described in this paper
Keywords:sintering machine support   base plate of support  installation   baes ponit   centre line