对红外测试工作中几个问题的探讨和分析
引用本文:王献春 何云峰. 对红外测试工作中几个问题的探讨和分析[J]. 河北电力技术, 1999, 18(4): 49-52
作者姓名:王献春 何云峰
作者单位:石家庄电业局!(050091·石家庄)
摘    要:怎样合理安排好红外检测工作的测试时间和周期,如何才能对设备缺陷做出正确判断,是红外测试工作中的2个难点。通过工作中的体会和认识,提出了一些看法和见解,同时对工作中发现的几起典型缺陷做了介绍和分析。

关 键 词:红外测试 电气设备 电力系统 变电站

Ways to Improve Quality of Steam and Water in Newly Built Sub critical Unit
Wang Xianchun,He Yunfeng. Ways to Improve Quality of Steam and Water in Newly Built Sub critical Unit[J]. Hebei Electric Power, 1999, 18(4): 49-52
Authors:Wang Xianchun  He Yunfeng
Abstract:How to reasonably arrange the test time and period of infrared detection work and how to get the correct judgement to the equipment's defects are two difficult problems of infrared test work.Based on the experience and acknowledgement,the authors propose their own points of view and opinion,and introduce and analyze some typical defects found in their work
Keywords:infrared test substation defect analysis