500kV运行线路铁塔整体移位施工技术
引用本文:马强,徐守琦.500kV运行线路铁塔整体移位施工技术[J].吉林电力,1998(5).
作者姓名:马强  徐守琦
作者单位:吉林省送变电公司 130021 (马强),吉林省送变电公司 130021(徐守琦)
摘    要:针对铁塔移位这一施工技术难题,我们决定对运行的500kV输电线路铁塔进行带线整体移位。通过对500kV及220kV运行线路中的7基铁塔的移位实践,获得了理想的施工效果。该技术填补了我国500kV铁塔带线整体移位技术的空白,其经济效益和社会效益极为显著,具有推广使用价值。

关 键 词:500  kV运行线路  铁塔  整体移位  施工

Technique on Pylon Integrative Moved with 500 kV Working Transmission Line
Ma Qiang Xu Shouqi.Technique on Pylon Integrative Moved with 500 kV Working Transmission Line[J].Jilin Electric Power,1998(5).
Authors:Ma Qiang Xu Shouqi
Affiliation:Ma Qiang Xu Shouqi
Abstract:We decided that pylon is moved with line in 500 kV working transmission line,as movement of pylon is difficult. This technique get ideal effect by practice of seven pylons within 500 kV and 200 kV working line. It fills in gaps on moving integrative pylon with 500 kV working line in China. Its economical and social benefit are very obvious,with great value of popularization and application.
Keywords:500 kV working line Pylon Integrated movement Construction