首页 | 本学科首页   官方微博 | 高级检索  
     

青铜峡电厂七号机组推力轴承受力调整
引用本文:李翠琳,李成家,单福平. 青铜峡电厂七号机组推力轴承受力调整[J]. 电网与水力发电进展, 1996, 0(4)
作者姓名:李翠琳  李成家  单福平
作者单位:西北电业职工大学,西北电力试验研究院
摘    要:水轮发电机组的正常运转要求各推力轴承轴瓦应均匀地承受推力负荷。青铜峡电厂是黄河上建成较早的一座水电厂,机组老化程度严重,其刚性支柱式的推力轴承受力调整的好坏直接影响着机组的安全与稳定运行。本文论述了青铜峡水电厂七号水轮发电机组推力轴承的受力调整过程,对类似机组的推力轴承受力调整具有一定指导意义。

关 键 词:水轮发电机,轴承,调整

Ordering Thrust of the Thrust Bearing for Qingtongxia Hydropower Plant's Seventh Units
Li Cuilin, Li Chengjia, Shan Fuping. Ordering Thrust of the Thrust Bearing for Qingtongxia Hydropower Plant's Seventh Units[J]. Advance of Power System & Hydroelectric Engineering, 1996, 0(4)
Authors:Li Cuilin   Li Chengjia   Shan Fuping
Abstract:The safety running of hydrogenerator needs thrust bearing sharing thrust load. Qingtongxia hydropower station is an old plant on the Yellow River,the units state is poor,and ordering thrust of the kingsbury thrust bearing is important. In this paper,it is stated the ordering thrust of the the bearing for Qingtongxia hydropower plant's seventh unit, and the ordering data are given, then the seventh unit safety runnming is scientifically considered.
Keywords:Hydraulic generator  Bearing   Generating set  Adjustment