1^#750m^3高炉停炉实践
引用本文:张故见,林晓辉.1^#750m^3高炉停炉实践[J].莱钢科技,2007(6):19-20.
作者姓名:张故见  林晓辉
摘    要:莱钢1^#750m^3高炉安全服役12年,采用空料线打水回收煤气停炉,整个过程安全、顺利、快速停炉。残铁口位置选定准确,残铁基本放净,为高炉大修创造了良好条件。

关 键 词:高炉  停炉  降料线  放残铁

Blowing out Practice of Laigang 750 - m^3 BF #1
Authors:Zhang Gujian Lin Xiaohui
Abstract:750 - m^3 blast furnace #1 in Laigang was in service safely for twelve years. It was blown out by adopting stock-line vacancy-and-water-drilling and coal gas reclaiming, the whole blowing out course being safe,smooth and high-speed. The position for crude pig iron was selected accurately, with crude pig iron being released on the whole, creating a fine condition for its overhaul.
Keywords:blast furnace  blow out  lowering stock-line  crude pig iron release