摘    要:在高岭背靠背换流站的换流变压器安装过程中,通过设计科学、合理的换流变压器安装工艺保障系统。提高了换流变压器安装工艺的准确性、科学性,提高了工作效率,解决了换流变压器施工中耗时多、浪费大(电能、人工、材料等)等问题,并对安装中遇到的气密性问题、套管介质损耗偏大、套管与本体接口处漏油等提出了解决措施。

关 键 词:背靠背换流站  换流变压器  安装技术

Installation of Converter Transformer
CHEN Xian-wei. Installation of Converter Transformer[J]. Electric Power Construction, 2008, 29(12): 48
Authors:CHEN Xian-wei
Abstract:In the process of converter transformer installation for Gaoling back-to-back converter station,problems,such as time consuming and large wastes(in energy,labor,and material,etc.)in transformer construction,as well as air tightness,large loss in sleeve medium,and oil leak in the interface between sleeve and body,etc.,which are common in installation,are solved through proper design of transformer installation supporting system and improving installation precision and efficiency.
Keywords:back-to-back converter station  converter transformer  installation technology