首页 | 本学科首页   官方微博 | 高级检索  
     

煤层气多分支水平井井身结构优化
引用本文:曹立虎,张遂安,石惠宁,谭扬军,谷溢,刘岩. 煤层气多分支水平井井身结构优化[J]. 石油钻采工艺, 2014, 36(3): 10-14. DOI: 10.13639/j.odpt.2014.03.003
作者姓名:曹立虎  张遂安  石惠宁  谭扬军  谷溢  刘岩
作者单位:1.中国石油大学北京气体能源开发与利用教育部工程研究中心,北京 102249
基金项目:国家科技重大专项“高产水/弱含水煤储层特性排采动态预测技术”(编号:2011ZX05034-003)、“山西沁水盆地煤层气水平井开发示范工程”(编号:2011ZX05061)、“鄂尔多斯盆地东缘煤层气开发示范工程”(编号2011ZX05062)、“山西晋城矿区采煤采气一体化煤层气开发示范工程”(编号:2011ZX05063)
摘    要:煤层气多分支水平井能有效增加控制面积,降低表皮因数,其井身结构优化对获得最经济有效的产能至关重要。为此,分析了煤层倾角、储层保护和井身结构对煤层气水平井产能的影响。采用数值模拟的方法,以沁水盆地南部某区块3#煤层为例,对多分支水平井的井身结构参数进行优化。优化结果表明:主支走向对产能影响较大,适宜的方向为垂直主渗透率方向;产能随着主支长度和分支长度的增加而增加,结合经济性和增产效果,主支长度宜控制在900~1 300 m之间,分支长度宜控制在250~400 m之间;分支间距和主分支夹角在一定程度上影响产能,分支间距宜控制在200~300 m之间,主支和分支夹角宜控制在36°~53°之间。研究结果可为煤层气多分支水平井的井身结构设计提供参考。

关 键 词:煤层气   多分支水平井   数值模拟   井身结构优化   产能影响因素
收稿时间:2019-05-11

Wellbore structure optimization to multi-lateral horizontal CBM well
Affiliation:1.Engineering Research Center of the Ministry of Education for Gas Energy Development & Utilization in China University of Petroleum Beijing, Beijing 1022492.Coalbed Methane Research Center of China University of Petroleum Beijing, Beijing 1022493.Petroleum Engineering Technology Research Institute, North China Oilfield Company, Renqiu, Hebei 062552
Abstract:Multi-lateral horizontal CBM wells can effectively increase the drainage area, reduce the skin factor and remarkably increase production capacity. In order to obtain the most cost-effective production capacity, the optimization of such wells’ wellbore structure is essential. This paper investigates the effects of coal seam dip angle, reservoir protection and wellbore structure on the productivity of horizontal CBM well. Taking a multi-lateral horizontal CBM well in 3# coal seam for block of the southern Qinshui basin, as an example, numerical simulation is conducted to optimize the parameters of the wellbore structure. It turned out that, the orientation of main hole had great impact on production capacity, with the most preferable orientation as perpendicular to the direction of main permeability; the production capacity increased with the lengths of main hole and laterals, which taking the economy and enhancement effecs should be controlled in 900~1 300 m and 250~400 m respectively; the spacing between laterals and the angle between main hold and lateral also impair the production capacity to some extent, which should be controlled in 200~300 m and 36°~53° respectively. The research results will provide reference for designing the wellbore structure of CBM multi-lateral horizontal well.
Keywords:
本文献已被 CNKI 等数据库收录!
点击此处可从《石油钻采工艺》浏览原始摘要信息
点击此处可从《石油钻采工艺》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号