乐滩水电站施工总布置设计
引用本文:林强光.乐滩水电站施工总布置设计[J].红水河,2009,28(4):11-14,19.
作者姓名:林强光
作者单位:广西电力工业勘察设计研究院,广西,南宁,530023
摘    要:介绍乐滩水电站施工布置条件及施工总体布置规划.乐滩水电站施工总布置设计时充分利用地形条件,以左岸为主、右岸为辅,用一隧洞将生活区与生产区作了巧妙的分区,因地制宜进行施工总布置取得了良好效果.

关 键 词:施工布置条件  料场选择  场内外交通  施工布置规划  弃碴场布置  乐滩水电站

General Layout Design for Construction of Letan Hydropower Station
LIN Qiang-guang.General Layout Design for Construction of Letan Hydropower Station[J].Hongshui River,2009,28(4):11-14,19.
Authors:LIN Qiang-guang
Affiliation:Guangxi Electric Power Industry Investigation Design and Research Institute;Nanning 530023
Abstract:Conditions and general layout planning for Letan Hydropower Station are presented.The design of construction layout makes full use of topographic conditions with the left bank playing a main role and the right bank playing a supporting role,in which living area and production area are divided by a tunnel.Such layout is satisfactory by taking advantages of local conditions.
Keywords:conditions of construction layout  quarry selection  communication inside and outside the site  construction layout planning  arrangement of debris yard  Letan Hydropower Station  