首页 | 本学科首页   官方微博 | 高级检索  
     

钢管混凝土柱施工技术
引用本文:常琳娜. 钢管混凝土柱施工技术[J]. 包钢科技, 2010, 36(2): 62-63,71. DOI: 10.3969/j.issn.1009-5438.2010.02.020
作者姓名:常琳娜
作者单位:包钢(集团)公司纪元建筑工程有限公司,内蒙古,包头,014010
摘    要:文章结合工程实践,对钢管混凝土结构施工中,钢管混凝土柱的制作、安装及钢管混凝土顶升浇注施工方法进行了总结。

关 键 词:钢管柱  顶升浇注  安装

Construction Technology of Concrete Columns Filled Steel Tubulars
CHANG Lin-na. Construction Technology of Concrete Columns Filled Steel Tubulars[J]. Science & Technology of Baotou Steel(Group) Corporation, 2010, 36(2): 62-63,71. DOI: 10.3969/j.issn.1009-5438.2010.02.020
Authors:CHANG Lin-na
Affiliation:CHANG Lin-na(Jiyuan Construction Engineering Co.of Baotou Steel(Group)Corp.,Baotou 014010,Nei Monggol,China)
Abstract:In the article,it is summarized the make and installation of concrete columns filled steel tubulars,as well as the methods of jacking and pumping concrete filled steel tubulars in the construction of concrete-filled steel tubular structures combined with practices.
Keywords:steel pipe column  jacking and pumping  installation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号