首页 | 本学科首页   官方微博 | 高级检索  
     

优化某铀矿冶工程336矿床开拓方案设计
引用本文:李振宗.优化某铀矿冶工程336矿床开拓方案设计[J].铀矿冶,2011,30(1).
作者姓名:李振宗
作者单位:中国核工业集团公司韶关金宏铀业有限责任公司,广东,韶关,512027
摘    要:通过对某铀矿冶工程336矿床开拓方案设计的分析,并经过技术经济论证,发现开拓370 m中段作为336矿井的出渣平硐不合理。提出取消370 m出渣平硐,并将330 m出矿平硐改为出矿、出渣综合运输平硐的优化措施,达到了节省投资、减少运营费用、降低成本的目的。

关 键 词:铀矿床  开拓方案  设计优化  改进  

Optimization of No.336 deposit exploitation scheme of a uranium mining and metallurgy project
LI Zhen-zong.Optimization of No.336 deposit exploitation scheme of a uranium mining and metallurgy project[J].Uranium Mining and Metallurgy,2011,30(1).
Authors:LI Zhen-zong
Affiliation:LI Zhen-zong(Shaoguan Jinhong Uranium Corporation,Ltd.,CNNC,Shaoguan 512027,China)
Abstract:Through the analyses of No.336 deposit exploitation design of a uranium mining and metallurgy project and the technical and economic feasibility,it is found that exploiting 370 m level as muck removal adit of No.336 mine is unreasonable.It is put forward that 370 m muck removal adit should be cancelled and 330 m ore removal adit should be changed to integrated transporting adit.The optimized measures can achieve the purposes of saving investment,reducing operation expenses and lowering cost.
Keywords:uranium deposit  exploiting plan  design optimization  improvement  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号