首页 | 本学科首页   官方微博 | 高级检索  
     


Case for Expanding the Claim Dispute Resolution Training of TxDOT Personnel
Authors:Yetkin Yildirim
Affiliation:Director, Texas Pavement Preservation Center, The University of Texas at Austin, 1616 Guadalupe, Suite 4.202, Austin, TX 78701-1225.
Abstract:Texas Department of Transportation (TxDOT) currently uses general alternative dispute resolution and dispute management tactics to resolve construction claims. The successful application by TxDOT of project partnering methods, critical path management, and the Contract Claims Committee has resulted in a relatively low number of claims filed. However, one weakness in TxDOT’s current methodology is the lack of specific protocol for project-level personnel and administrators. The following survey of TxDOT dispute resolution methods emphasizes the importance of developing a personnel training catalog for Area Engineers in order to avoid costly claim dispute escalation. As the individual primarily responsible for resolving project and district-level disputes, the Area Engineer should be equipped with dispute resolution training if TxDOT wishes to improve the efficiency of its alternative dispute resolution protocol.
Keywords:Contracts  Claims  Dispute resolution  Training  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号