首页 | 本学科首页   官方微博 | 高级检索  
     


Integrated Schedule and Cost Model for Repetitive Construction Process
Authors:Kyuman Cho  Taehoon Hong  Changtaek Hyun
Affiliation:1Research Professor, Dept. of Architectural Engineering, Univ. of Seoul, Seoul 130-743, Korea.
2Assistant Professor, Dept. of Architectural Engineering, Yonsei Univ., Seoul 120-749, Korea (corresponding author). E-mail: hong7@yonsei.ac.kr
3Professor, Dept. of Architectural Engineering, Univ. of Seoul, Seoul 130-743, Korea.
Abstract:Several efforts have been made by many researchers to develop a model for schedule and cost integration in construction projects, but it is difficult to integrate and manage schedule and cost in an actual construction site using such a model. The integrated schedule and cost model developed in this study (1) enables the planning and control of repetitive construction processes and (2) can be used by a project manager in an actual construction site. Furthermore, an integrated schedule and cost model for the core wall construction, which is an important repetitive process in the recently booming high-rise building construction in terms of scheduling, was developed using the integration model developed in this study. It is expected that the integrated schedule and cost model developed can allow project managers to integrate the schedule and cost of repetitive construction processes more effectively and support the project managers’ decision-making.
Keywords:Integrated systems  Scheduling  Construction cost  Planning  Models  Decision making  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号