首页 | 本学科首页   官方微博 | 高级检索  
     

液压挖掘机回转制动能量回收系统
引用本文:管成,徐晓,林潇,王守洪. 液压挖掘机回转制动能量回收系统[J]. 浙江大学学报(工学版), 2012, 46(1): 142-149. DOI: 10.3785/j.issn.1008-973X.2012.01.23
作者姓名:管成  徐晓  林潇  王守洪
作者单位:1.浙江大学 机械设计研究所,浙江 杭州 310027;2.上海汽车集团股份有限公司技术中心,上海 201804;3.山重建机有限公司,山东 济宁 272100
基金项目:国家“863”高技术研究发展计划资助项目(2010AA044401)
摘    要:为了回收液压挖掘机在回转阶段的制动能量,提出一种基于回转马达进/出口压力差自动识别回转过程所处阶段,决策能量回收的全液压自动控制回转制动能量回收系统.引入一正态分布函数,以蓄能器压力状态(SOP)、液压泵出口压力以及负流量反馈压力为输入信号,根据负载的实时需求功率,提出一种以复合恒功率 负流量动力控制决策发动机和蓄能器主辅动力源的能量分配方法,保证回转机构的正常高效运转.仿真结果表明,当回转系统作为单独执行机构时,采用该回收系统的液压挖掘机,能够实现高达50.0%的再生制动能量用于驱动回转的能量回收利用效率,在相同工况下比同吨位液压挖掘机节能16.3%,不影响操作习惯和操作性能.

关 键 词:液压挖掘机  混合动力  回转制动  能量回收

Recovering system of swing braking energy in hydraulic excavator
GUAN Cheng,XU Xiao,LIN Xiao,WANG Shou-hong. Recovering system of swing braking energy in hydraulic excavator[J]. Journal of Zhejiang University(Engineering Science), 2012, 46(1): 142-149. DOI: 10.3785/j.issn.1008-973X.2012.01.23
Authors:GUAN Cheng  XU Xiao  LIN Xiao  WANG Shou-hong
Affiliation:1.Institute of Mechanical Design,Zhejiang University,Hangzhou 310027,China;2.SAIC Motor Technical Center, Shanghai 201804,China;3.Strong Construction Machinery Limited Company,Jining 272100,China)
Abstract:In order to recover the braking energy from the hydraulic excavator during swing phase,an automatic hydraulic-controlled braking energy recovery system was proposed which can automatically identify the swing stage by the pressure difference between inlet and outlet of the swing pump and determining distribution algorithm of the recovering energy.One normal school function was introduced.State of pressure(SOP) of the accumulator,the outlet pressure of the hydraulic pump and the feedback pressure from negative-flow control were considered as input signals.According to the real-time required power of the load,the energy distribution algorithm was proposed based on the comprehensive constant-power negative-flow control between the main power source and the auxiliary power source(that is engine and accumulator),which ensures the normal operation of the swing mechanism.Simulation results show that the hydraulic excavator equipped with the swing recovery system can achieve 16.3% energy saving compared with the baseline under the same working condition,and the overall chain efficiency from the total braking energy to the terminal swing mechanism is as much as 50.0% approximately while the swing is utilized as the actuator alone.
Keywords:hydraulic excavator  hybrid power  swing regenerative braking  energy recovery
本文献已被 CNKI 等数据库收录!
点击此处可从《浙江大学学报(工学版)》浏览原始摘要信息
点击此处可从《浙江大学学报(工学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号