首页 | 本学科首页   官方微博 | 高级检索  
     

近距离交叠隧道施工影响的数值模拟
引用本文:包德勇.近距离交叠隧道施工影响的数值模拟[J].地下空间与工程学报,2011,7(1):127-132,206.
作者姓名:包德勇
作者单位:中铁第四勘察设计院集团有限公司,武汉,430063
摘    要:由于地质条件的限制及地下空间的综合开发利用,在工程中有时不可避免地产生近距离交叠隧道.对于这种型式的隧道,新建隧道是在既有隧道完成之后修建的,新建隧道的施工势必影响既有隧道结构的受力状态,引起既有隧道变形.本文应用ANSYS有限元程序采用三维弹塑性数值计算方法对某新建铁路隧道下穿既有高速公路隧道的施工过程进行了模拟,揭...

关 键 词:交叠隧道  相互影响  有限元模拟  隧道施工

Numerical Simulation on Effect of Construction in Closely Overlapped Tunnels
Bao Deyong.Numerical Simulation on Effect of Construction in Closely Overlapped Tunnels[J].Chinese Journal of Underground Space and Engineering,2011,7(1):127-132,206.
Authors:Bao Deyong
Affiliation:Bao Deyong(China Railway Siyuan Survey and Design Group Co.Ltd.,Wuhan 430063,China)
Abstract:Closely overlapped tunnels have emerged because of the limit of geological condition and utilizing the underground space efficiently.For this kind of tunnels,the newly-built tunnel is constructed after the existing tunnel,the excavation will inevitably affect the stresses distribution of the existing tunnel and cause the existing tunnel to deform or settle unevenly.In this paper,a three dimensional elasto-plastic finite element model in ANSYS is established to analyze the construction process of a newly-built railway tunnel passing through under an existing highway tunnel.The analysis results show how the stress and displacement of existing tunnel change with the construction process of the newly-built tunnel.The information gained in this paper will provide the reference for the design and construction of similar tunnels.
Keywords:overlapped tunnels  interaction  finite element simulation  tunnel construction
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号