首页 | 本学科首页   官方微博 | 高级检索  
     


Comments on the erratum to “Supply planning model for remanufacturing system in reverse logistics environment” [Comput. Ind. Eng. 51 (2006) 279–287]
Authors:Krishnendu Mukherjee  Bijan Sarkar  Ardhendu Bhattacharya
Affiliation:aDepartment of Production Engineering, Jadavpur University, Kolkata 700032, India;bDepartment of Mechanical Engineering, Jadavpur University, Kolkata 700032, India
Abstract:To maximize the total cost of savings, a mixed-integer programming model for remanufacturing proposed by Kim et al. Kim, K., Song, I., Kim, J., & Jeong, B. (2006). Supply planning model for remanufacturing system in reverse logistics environment. Computers & Industrial Engineering, 51, 279–287] was published in Computers & Industrial Engineering journal to decide optimally the quantity of parts to be processed at each remanufacturing facilities, the number of purchased parts from subcontractor. In this work, comments and suggestions are given to the published model of Kim, Song, Kim, and Jeong (2006). Comments like partial and complete disassembly, disassembly cost, optimum level of disassembly and finally, the modification of constraints are suggested in this work.
Keywords:Remanufacturing  Disassembly cost  Optimal level of disassembly
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号