首页 | 本学科首页   官方微博 | 高级检索  
     

连续重整装置扩能改造问题探讨
引用本文:何文全. 连续重整装置扩能改造问题探讨[J]. 炼油技术与工程, 2010, 40(3)
作者姓名:何文全
作者单位:中国石油化工股份有限公司上海高桥分公司,上海市,200137
摘    要:介绍了中国石油化工股份有限公司上海高桥分公司0.6 Mt/a连续重整装置扩能至0.8 Mt/a的改造情况,改造内容主要包括:预加氢采用高空速催化剂;四合一炉增加炉管;重整进料换热器由板式替代原立式;再接触系统氨冷冻改造;分馏系统部分塔塔盘更换为高效塔盘等。分析了改造后装置运行存在的问题。

关 键 词:连续重整装置  扩能改造  换热器  高效塔盘

Study on expansion revamping of a CCR unit and subsequent problems
He Wenquan. Study on expansion revamping of a CCR unit and subsequent problems[J]. Petroleum Refinery Engineering, 2010, 40(3)
Authors:He Wenquan
Affiliation:He Wenquan SINOPEC Shanghai Gaoqiao Company(Shanghai 200137; China);
Abstract:The capacity of the CCR unit has been expanded from 14 000 b/d to 18 600 b/d in SINOPEC Shanghai Gaoqiao Petrochemical Co.,Ltd.The revamping work mainly include:application of high velocity catalysts for feed hvdrotreating,addition of tubes to the furnace,replacement of vertical heat exchanger with plate heat exchanger,revamping of chiller in re-contacting system and installation of high-efficiency trays in fraction tower,etc.The problems in operation after revamping are analyzed.
Keywords:CCR unit  expansion revamping  heat exchanger  high-efficiency tray
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号