珠海发电厂1号机组甩负荷试验
引用本文:赵伟. 珠海发电厂1号机组甩负荷试验[J]. 广东电力, 2000, 13(6): 59-61
作者姓名:赵伟
作者单位:珠海发电厂,广东,珠海,519020
摘    要:介绍了珠海发电厂1号机组甩25%,50%和75%和100%负荷试验的方法、步骤和甩负荷特性,并结合实际情况对每次甩负荷情况进行了分析。甩负荷时暴露出控制系统整体协调不好、处理紧急情况能力不强等问题,制造公司采取了相应的解决措施。针对这些解决措施,从机组整体考虑,提出了个人的看法。

关 键 词:汽轮发电机组 甩负荷试验 发电厂

Load rejection tests for Unit 1 in Zhuhai Power Plant
ZHAO Wei. Load rejection tests for Unit 1 in Zhuhai Power Plant[J]. Guangdong Electric Power, 2000, 13(6): 59-61
Authors:ZHAO Wei
Abstract:The method, procedures of 25%, 50%, 75% and 100% load rejection tests for Unit 1 in Zhuhai Power Plant are described together with analysis of the test results. The weakness in overall coordination of the control system and its inadequate ability in handling emergencies were revealed in the tests, and corresponding countermeasures were taken by the manufacturer. Taking consideration of the whole unit, the author also presents his views on these measures.
Keywords:load rejection  FCB  steam turbine by pass  DCS  OPC  MFT  CCS  