始兴山口三级电站大坝碾压砼的施工
引用本文:秦宏新.始兴山口三级电站大坝碾压砼的施工[J].广东水利电力职业技术学院学报,2003,1(2):45-47,49.
作者姓名:秦宏新
作者单位:广东省水利水电工程第二工程局股份有限公司,广东增城,511340
摘    要:本文概括介绍了始兴山口三级电站大坝碾压砼的施工,主要包括碾压砼的施工工艺流程、碾压 砼施工配合比选择、砼拌和与运输、卸料与平仓、碾压方式、层间处理、养护、夏季高温季节的施工等。

关 键 词:碾压砼施工  大坝  始兴山口三级电站
文章编号:1672-2841(2003)02-0045-03
修稿时间:2003年4月23日

Construction of Roller Compacted Concrete dam of Three-stage Power Station of Shixing Mountain pass
QIN Hong-xin.Construction of Roller Compacted Concrete dam of Three-stage Power Station of Shixing Mountain pass[J].Journal of Guangdong Technical College of Water Resources and Electric Engineering,2003,1(2):45-47,49.
Authors:QIN Hong-xin
Abstract:This article is a summary introducing the Construction of Roller Compacted Concrete dam of Three - stage Power Station of Shixing Mountain pass including the work flow of construction of roller compacted concrete, mix proportion choice of construction of roller compacted concrete, concrete mixing and transportation, unloading and leveling, method of roller compacted, interlayer management, curing, construction of summer mega - thermal season and so on.
Keywords:construction of roller compacted concrete  dam  three - stage power station of Shixing mountain pass  