首页 | 本学科首页   官方微博 | 高级检索  
     

立井冻土爆破延迟时间计算结构模型研究
引用本文:宗琦,苏廷志. 立井冻土爆破延迟时间计算结构模型研究[J]. 工程爆破, 2006, 12(2): 9-11
作者姓名:宗琦  苏廷志
作者单位:安徽理工大学,安徽,淮南,232001;安徽理工大学,安徽,淮南,232001
摘    要:立井冻土掘进爆破合理的段间延迟时间应是在保证冻结壁和冻结管安全的前提下,能够获得良好的爆破效果。本文以此为出发点,重点从新自由面完全形成和降低爆破震动效应两个方面,对延迟起爆时间进行了初步探讨,建立了间隔延迟时间的计算结构模型;并就目前立井冻土爆破的施工条件,提出获得良好爆破效果的起爆延迟时间是100~200ms;而为降低爆破震动确保安全,延迟间隔时间则宜取200~250ms;综合考虑取值250ms,即选用1/4秒系列雷管较为适宜。现场井筒冻结段掘进爆破实践也验证了1/4秒延期起爆的合理性。

关 键 词:立井  冻土爆破  延迟时间  计算模型
文章编号:1006-7051(2006)02-0009-03
收稿时间:2006-01-23
修稿时间:2006-01-23

STUDY ON DELAY TIME CALCULATION STRUCTURE MODEL OF FROZEN-SOIL BLASTING IN SHAFT
ZONG Qi,SU Ting-zhi. STUDY ON DELAY TIME CALCULATION STRUCTURE MODEL OF FROZEN-SOIL BLASTING IN SHAFT[J]. Engineering Blasting, 2006, 12(2): 9-11
Authors:ZONG Qi  SU Ting-zhi
Affiliation:Anhui University of Science and Technology, Huainan 232001, Anhui , China
Abstract:The reasonable delay time Δt for frozen-soil tunnel blasting in shaft should be determined in terms of assuring the safety of frozen wall and frozen pipes and obtaining good blasting effects.Accordingly,emphasizing on the two facts of new free face forming completely and decreasing blasting vibrating effects,the authors analyzed delay detonation time and built calculation structure model of interval of delay time.Meanwhile,according to the construction condition of present frozen-soil blasting in shaft,the authors suggested that the delay detonation time should be 100~200ms for getting good blasting effects,but for decreasing blasting vibration and assuring the safety the proper delay time fell into 200~250ms.The authors determined Δt=250ms as the delay time through comprehensive consideration of the blasting situation,that is,the(1/4)s series detonators were adopted.The experiences of site wall casing frozen section tunnel blasting verified the reasonability of(1/4)s-delay time.
Keywords:Shaft   Frozen-soil blasting    Delay time   Calculation model
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号