首页 | 本学科首页   官方微博 | 高级检索  
     

经柔直电网互联的含抽蓄的联合发电系统最大供电量计算
引用本文:张晓华,魏子睿,马煜,耿光飞,杨晓楠. 经柔直电网互联的含抽蓄的联合发电系统最大供电量计算[J]. 电力系统保护与控制, 2020, 48(4): 134-142. DOI: 10.19783/j.cnki.pspc.190321
作者姓名:张晓华  魏子睿  马煜  耿光飞  杨晓楠
作者单位:国网东北电力调控分中心,辽宁沈阳110180;中国农业大学,北京100083;辽宁省电力有限公司沈阳供电公司,辽宁沈阳110000;中国电力科学研究院有限公司,北京100192
基金项目:北京市科委项目“柔直电网汇集新能源接入交流电网调度技术研究”(Z161100004816025);国家电网科技项目资助“±500 kV柔性直流电网调度技术研究”
摘    要:为充分利用风光发电能量,合理调度抽水蓄能电站,针对经柔直电网互联的风光蓄联合发电系统向远方负荷中心供电这一工程实际需求,提出基于日供电量最大的抽水蓄能发电优化调度模型及方法。采用最优潮流法计算受电区(负荷中心)全天的消纳极限。并以此极限为约束,同时考虑抽蓄电站库容与运行工况等限制,建立了抽蓄电站功率优化调度模型。提出的分段法与等效面积法显著提升了优化模型的计算速度。在某地风光蓄发电系统与柔直输电网架结构的基础上,用IEEE30节点系统模拟受端电网,建立仿真算例。比较了几种最大供电量计算方法的结果,验证了所提方法与模型的有效性。

关 键 词:风光蓄联合发电  最大供电能力  动态优化  削峰填谷  柔直电网
收稿时间:2019-03-23
修稿时间:2019-06-13

Maximum power supply calculation of combined power generation with pumped storage system interconnected by VSC-HVDC grid
ZHANG Xiaohu,WEI Zirui,MA Yu,GENG Guangfei and YANG Xiaonan. Maximum power supply calculation of combined power generation with pumped storage system interconnected by VSC-HVDC grid[J]. Power System Protection and Control, 2020, 48(4): 134-142. DOI: 10.19783/j.cnki.pspc.190321
Authors:ZHANG Xiaohu  WEI Zirui  MA Yu  GENG Guangfei  YANG Xiaonan
Affiliation:State Grid Northeast Power Control Subcenter, Shenyang 110180, China,China Agricultural University, Beijing 100083, China,Shenyang Power Supply Company, Liaoning Electric Power Co., Ltd., Shenyang 110000, China,China Agricultural University, Beijing 100083, China and China Electric Power Research Institute Ltd., Beijing 100192, China
Abstract:In order to make full use of the energy of wind-photovoltaic power generation and rationally dispatch pumped storage power stations, this paper proposes an optimal dispatching model and method for pumped storage power generation based on the maximum daily power supply, aiming at the actual demand of the project that the wind-photovoltaic storage combined power generation system interconnected through VSC-HVDC grid supplies power to remote load centers. The optimal power flow method is used to calculate the all-day renewable energy consumption limit of the power receiving area(load center). Taking this limit as constraint and considering the reservoir capacity and operation condition of pumped storage station, an optimal power dispatching model for pumped storage station is established. The proposed segmentation method and equivalent area method significantly improve the calculation speed of the optimization model. The simulation case is based on the structure of wind-photovoltaic storage power system and flexible VSC-HVDC power grid in a certain area, the load center power grid is simulated with the IEEE30-bus system. The results of several calculation methods of maximum power supply are compared, which verifies the effectiveness of the proposed methods and models.
Keywords:wind-photovoltaic-pumped storage systems   maximum power supply capability   dynamic optimization   peak load shifting   VSC-based DC grid
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号