首页 | 本学科首页   官方微博 | 高级检索  
     


An end-use energy analysis in a Malaysian public hospital
Authors:R Saidur  M Hasanuzzaman  S Yogeswaran  HA Mohammed  MS Hossain  
Affiliation:a Department of Mechanical Engineering, University of Malaya, Faculty of Engineering, 50603 Kuala Lumpur, Malaysia;b Centre of Research UMPEDAC, Level 4, Engineering Tower, Faculty of Engineering, University of Malaya, 50603 Kuala Lumpur, Malaysia;c Department of Mechanical Engineering, College of Engineering, Universiti Tenaga Nasional, Km 7, Jalan Kajang-Puchong, 43009 Kajang, Selangor, Malaysia
Abstract:The commercial sector consumes 8–50% of the total energy consumption for a few selected countries around the world. An energy audit was conducted in a Malaysian public hospital to identify energy using equipment and their energy consumption breakdown. Different energy saving measures have been identified and applied for electrical motors used in this hospital. It was estimated that this hospital consumed about 19,311 MW h for the year 2008. It was also estimated that about 212 MW h, 250 MW h and 317 MW h of annual energy can be saved using energy-efficient motors at 50%, 75% and 100% loads, respectively. In addition, use of variable speed drives are expected to save 1735 MW h, 4048 MW h and 6361 MW h of annual energy consumption for 20%, 40% and 60% speed reductions, respectively. It was found that the payback period for using high efficiency motors at different loads is less than a year which is economically very viable. However, the use of variable speed drives was found to be economically viable for larger motors for higher speed reductions. The study also found that a sizeable amount of emissions can be reduced for the different energy savings measures applied for electrical motors.
Keywords:Energy savings  Public hospital  Emission reduction
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号