首页 | 本学科首页   官方微博 | 高级检索  
     

孤岛型边角煤柱工作面反弧形覆岩结构诱冲机理及其控制
引用本文:李佃平,窦林名,牟宗龙,郭晓强,刘礼鹏. 孤岛型边角煤柱工作面反弧形覆岩结构诱冲机理及其控制[J]. 煤炭学报, 2012, 37(5): 719-724
作者姓名:李佃平  窦林名  牟宗龙  郭晓强  刘礼鹏
作者单位:1.中国矿业大学 矿业工程学院 煤炭资源与安全开采国家重点实验室,江苏 徐州221116;;2.兖州煤业股份有限公司 兖矿集团博士后工作站,山东 邹城,272000
基金项目:国家自然基金和神华集团有限公司联合资助项目,煤炭资源与安全开采国家重点实验室自主研究课题,江苏高校优势学科建设工程资助项目
摘    要:为有效控制边角煤柱回收过程的冲击矿压灾害,根据三侧采空的孤岛型边角煤柱特点,采用理论分析和数值模拟方法,分析了上覆岩层结构特征及诱冲机理及其控制措施.研究得出:三侧采空的孤岛型边角煤柱工作面具有“T”形与“Γ" 形结构组成的反弧形覆岩结构,该结构使煤柱形成一环绕工作面的反弧形高应力和弹性能积聚区;回采过程中,“Γ" 形悬顶的周期性运动导致反弧形覆岩结构处于动态变化过程,动静应力综合作用对煤体稳定状态造成影响,是诱发冲击矿压的主要原因;提出了对沿空巷道实体煤侧实施卸压弱化、对窄煤柱侧实施支护强化的非对称控制对策,降低反弧形覆岩结构的影响,控制冲击危险。

关 键 词:边角煤柱工作面  孤岛型  反弧形覆岩结构  冲击矿压  非对称控制,
收稿时间:2012-03-05

The anti-arc overlying strata structure induced mechanism and control of isolated corner coal pillar working face
LI Dian-ping,DOU Lin-ming,MU Zong-long,GUO Xiao-qiang,LIU Li-peng. The anti-arc overlying strata structure induced mechanism and control of isolated corner coal pillar working face[J]. Journal of China Coal Society, 2012, 37(5): 719-724
Authors:LI Dian-ping  DOU Lin-ming  MU Zong-long  GUO Xiao-qiang  LIU Li-peng
Affiliation:1(1.State Key Laboratory of Coal Resources and Safe Mining,School of Mines,China University of Mining and Technology,Xuzhou 221116,China;2.Postdoctoral Workstation of Yankuang Group,Yanzhou Coal Mining Group Corporation,Zhoucheng 272000,China)
Abstract:In order to effectively control rock burst disaster due to the process of corner coal pillar recovery,it is available to use the theoretical analysis and numerical simulation to analyze the overburden structural characteristics and induced mechanism and control measures depending on characteristics of isolated coal pillar with trilateral gob.It shows that isolated corner coal pillar working face with trilateral gob has anti-arc overlying rock structure composed of "T" and "г" structure,which can make the coal pillar form an anti-arc high stress and elastic energy accumulation district around the working face;the main reason which induced rock burst is that the cyclical movement of "г" structure leads to the anti-arc overlying rock structure being in the dynamic process and the comprehensive role of the static and dynamic stress affect the steady state of the coal body in the process of recovery.This paper puts forward the non-symmetric control countermeasures weakening the implementation of relief along the coal side of roadway and strengthening support to narrow coal pillar side,to reduce the impact of anti-arc structure of overlying strata and control the impact of risk.
Keywords:corner coal pillar working face  island type  anti-arc overlying strata structure  rock burst  non-symmetric control
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《煤炭学报》浏览原始摘要信息
点击此处可从《煤炭学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号