上犹江水电厂黑启动实践与探讨
引用本文:袁宏.上犹江水电厂黑启动实践与探讨[J].江西电力职工大学学报,2013(1):38-41.
作者姓名:袁宏
作者单位:江西上犹江水电厂,江西赣州341000
摘    要:电网全部或部分因故障停电后,采用黑启动方案,通过系统具有启动能力的机组,可迅速恢复供电。本文介绍了上犹江水电厂的黑启动实践,并根据该厂运行情况就下列几个方面进行了论述:一是机组调频调压带厂用电;二是机组递升加压开机恢复厂用电;三是通过柴油机带厂用电;四是零启动电源送电恢复厂用电;五是等待电网恢复电压后由系统倒送电或启动机组恢复厂用电。

关 键 词:运行方式  准则  措施  注意事项

Practice and Discussion on the Shangyoujiang Hydropower Plant Black Start
YUAN Hong.Practice and Discussion on the Shangyoujiang Hydropower Plant Black Start[J].Journal of Jiangxi Electrical University For Staff,2013(1):38-41.
Authors:YUAN Hong
Affiliation:YUAN Hong (Shangyoujiang Hydropower Plant of Jiangxi Province,Gangzhou 341000,China)
Abstract:Power grid using black start scheme can recover after all or part of the power outage be- cause of malfunction through the system unit which is capable of starting. Black start practice at Shangy- oujiang Hydropower plant has been introduced in this paper,and according to the plant operation, the following several aspects are discussed:first is FM surge tank with auxiliary power unit;second is ascending pressure to start restore factory electricity;the third is through the diesel engine with auxiliary power;the fourth is zero starting power transmission recovery plant electricity;the fifth is waiting for system recovery voltage electric transmission or start restore auxiliary power unit.