首页 | 本学科首页   官方微博 | 高级检索  
     

铜矿峪矿二期工程误差预计方案探讨
引用本文:张义,郭建明. 铜矿峪矿二期工程误差预计方案探讨[J]. 有色金属(矿山部分), 2007, 59(3): 39-41
作者姓名:张义  郭建明
作者单位:中条山有色金属公司铜矿峪矿,山西垣曲,043706
摘    要:通过对支导线终点误差产生的原因进行分析,找出产生终点误差的多方因素。首次提出利用转轴方程计算在巷道指定方向上的终点误差,并根据铜矿峪矿二期工程实际状况提出误差预计、施测方案建议。

关 键 词:支导线  终点  误差预计
文章编号:1671-4172(2007)03-0039-03

Discussion of Error Estimating Plan in Second-Phase Project of Tongkuangyu Copper Mine
Zhang Yi,Guo Jianming. Discussion of Error Estimating Plan in Second-Phase Project of Tongkuangyu Copper Mine[J]. , 2007, 59(3): 39-41
Authors:Zhang Yi  Guo Jianming
Affiliation:ZTS Non- ferrous Metals Group Co. , Ltd
Abstract:Multiple factors resulted in endpoint error are discovered by analizing the causes for the wire end - point error. It is proposed firstly that the revolutionaxis equation can be used for conputation of end - point error in assigned tunnel direction. Based on actual conditions of second - phase project, a suggestion for error estimation and survey plan has been put forward.
Keywords:wire   end point   error estimation
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《有色金属(矿山部分)》浏览原始摘要信息
点击此处可从《有色金属(矿山部分)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号