首页 | 本学科首页   官方微博 | 高级检索  
     

秦山一期反应堆压力容器更换顶盖水压试验工作应变测试分析
引用本文:江才林,徐济进. 秦山一期反应堆压力容器更换顶盖水压试验工作应变测试分析[J]. 上海电气技术, 2011, 4(4): 1-4,19
作者姓名:江才林  徐济进
作者单位:1. 上海电气核电设备有限公司,上海,210306
2. 上海交通大学,上海,200240
摘    要:介绍了秦山一期反应堆压力容器更换顶盖的水压试验工作应变测试分析,以判断水压试验对高应力区的受力均匀性影响,水压试验是否会造成设备的塑性变形.

关 键 词:顶盖  水压试验  应变  测量

Qinshan Phase 1 RPV Closure Head Replacement Strain Analysis for Hydraulically Test
JIANG Cailin,XUJijin. Qinshan Phase 1 RPV Closure Head Replacement Strain Analysis for Hydraulically Test[J]. Journal of Shanghai Electric Technology, 2011, 4(4): 1-4,19
Authors:JIANG Cailin  XUJijin
Affiliation:1.Shanghai Electric Nuclear Power Equipment Company,Shanghai 210306,China;2.Shanghai Jiaotong University,Shanghai 200240,China)
Abstract:Study the relationship between pressure and strain during hydraulic test process for QINSHAN phase 1 RPV Closure Head Replacement,to assess the stress concentration of Closure Head is homogenous,and analyze the residual deformation after hydraulic test.
Keywords:closure head  hydraulic test  strain  measure
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号