江垭全断面碾压混凝土重力坝设计中的几个问题
引用本文:彭强.江垭全断面碾压混凝土重力坝设计中的几个问题[J].水电站设计,1996,12(4):1-8,15.
作者姓名:彭强
作者单位:湖南省水利水电勘测设计研究总院
摘    要:江垭水利枢纽大坝为全断面碾压混凝土重力坝,坝高128m,本文就全断面碾压混凝土筑坝新技术的应用、坝型选择、坝基排水等作了全面论述,并对施工攻需进一步研究的问题提出了建议。

关 键 词:断面  坝基排水  混凝土重力坝  碾压混凝土  设计

Several Questions in Whole Profile Roller Compacted Concrete Gravity Dam of Jiangya Project
Peng,Qiang.Several Questions in Whole Profile Roller Compacted Concrete Gravity Dam of Jiangya Project[J].Design of Hydroelectric Power Station,1996,12(4):1-8,15.
Authors:Peng  Qiang
Abstract:This is a whole profile roller compacted concrete gravity dam with height 128m.The new technique application of the dam construction,dam type selection and dam foundation drainage are described all sidedly,the suggestions for construction and questions necessary to further study presented.
Keywords:roller  compacted  concretc  dam  section  dam  foundation  drainage  dam  design  Jiangya  hydro  junction  