首页 | 本学科首页   官方微博 | 高级检索  
     

基于分布参数模型的双端非同步故障测距算法
引用本文:施世鸿,何奔腾. 基于分布参数模型的双端非同步故障测距算法[J]. 电网技术, 2008, 32(9): 85-88
作者姓名:施世鸿  何奔腾
作者单位:浙江大学,电气工程学院,浙江省,杭州市,310027
摘    要:基于线路分布参数模型,提出一种双端非同步故障测距算法。该算法根据电路叠加原理,将故障后的网络等效为正常状态网络和故障分量网络的叠加,然后以单相系统为例,以故障距离和非同步时间作为未知数,对正常电流电压相量和故障分量分别建立测距方程组,推导出故障距离的解析表达式,并给出了伪根的识别方法。文章还分析了该算法对三相系统的适用性。仿真结果表明,该算法消除了非同步时间的影响,适用于各种故障类型,无需选相,计算量小,测距精度高,较好地解决了双端测距中的数据不同步问题。

关 键 词:输电线路  双端测距  非同步数据  分布参数模型
文章编号:1000-3673(2008)09-0084-05
收稿时间:2007-06-11
修稿时间:2007-08-28

A Two-Terminal Fault Location Algorithm Using Asynchronous Phasors Based on Distributed Parameter Model
SHI Shi-hong,HE Ben-teng. A Two-Terminal Fault Location Algorithm Using Asynchronous Phasors Based on Distributed Parameter Model[J]. Power System Technology, 2008, 32(9): 85-88
Authors:SHI Shi-hong  HE Ben-teng
Affiliation:School of Electrical Engineering,Zhejiang University,Hangzhou 310027,Zhejiang Province,China
Abstract:Based on distributed parameter model of power transmission line, a new two-terminal fault location algorithm in which asynchronous phasors are used is proposed. According to the superposition principle of electric circuits, the post-fault power network is equivalent to the superposition of network in normal state and that composed by fault components;then taking single-phase system for example, the fault distance and asynchronous time are taken as unknown numbers and the fault location equations for normal voltage and current phasors as well as fault components are established;and then the analytical expression for fault distance is deduced, in addition the recognition method of false root is given. The applicability of the proposed method in three-phase system is analyzed. ATP-EMTP based simulation results show that the proposed method can eliminate the influence of asynchronous time and is suitable to all types of faults, the fault location is accurate and the computation amount is little, in addition, it is not needed to identify the faulty phase or fault type and the problem of data asynchronization in two-terminal fault location is solved well.
Keywords:transmission line  two-terminal fault location  asynchronous data  distributed parameter model
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电网技术》浏览原始摘要信息
点击此处可从《电网技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号