首页 | 本学科首页   官方微博 | 高级检索  
     

考虑可靠性收益的配电网智能软开关规划方法
引用本文:赵金利,陈昊,宋关羽,范心明,李鹏,吴建中.考虑可靠性收益的配电网智能软开关规划方法[J].电力系统自动化,2020,44(10):22-31.
作者姓名:赵金利  陈昊  宋关羽  范心明  李鹏  吴建中
作者单位:1.智能电网教育部重点实验室,天津大学,天津市300072;2.广东电网有限责任公司佛山供电局,广东省佛山市528000;3.英国卡迪夫大学工程学院,卡迪夫 CF24 3AA,英国
基金项目:国家自然科学基金委员会-国家电网公司智能电网联合基金资助项目(U1866207);国家自然科学基金青年基金资助项目(51807132)。
摘    要:智能软开关(SOP)具有较强的潮流控制能力,在配电网正常运行场景下和故障环境中均能有效发挥作用,在规划层面应兼顾其对于配电网供电可靠性与运行经济性提升所带来的综合收益。文中综合考虑了SOP接入对配电网供电可靠性和运行经济性的影响,建立了智能软开关规划模型;采用快速搜索和发现密度峰聚类方法对年负荷数据进行聚类,生成配电网典型运行场景以计算其对运行经济性的提升收益;采用基于关联约束的支路故障率计算方法,考虑线路电流负载率、节点电压以及线路长度对支路故障率的影响,生成动态预想故障集以计算供电可靠性收益;采用模拟退火与二阶锥规划相结合的混合算法对上述规划模型进行求解,最后,在PGE 69节点算例上验证了所提规划模型的有效性。结果表明,面向配电网可靠性与经济性的SOP规划方法能够有效降低配电网综合成本,实现投资效益的最大化。

关 键 词:配电网  智能软开关  供电可靠性  运行经济性  关联约束
收稿时间:2019/7/15 0:00:00
修稿时间:2019/10/17 0:00:00

Planning Method of Soft Open Point in Distribution Network Considering Reliability Benefits
ZHAO Jinli,CHEN Hao,SONG Guanyu,FAN Xinming,LI Peng,WU Jianzhong.Planning Method of Soft Open Point in Distribution Network Considering Reliability Benefits[J].Automation of Electric Power Systems,2020,44(10):22-31.
Authors:ZHAO Jinli  CHEN Hao  SONG Guanyu  FAN Xinming  LI Peng  WU Jianzhong
Affiliation:1.Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China;2.Foshan Power Supply Bureau of Guangdong Power Grid Co., Ltd, Foshan 528000, China;3.School of Engineering, Cardiff University, Cardiff CF24 3AA, UK
Abstract:Soft open points (SOPs), which have powerful capability of power flow control, can make positive contribution under normal operation and fault conditions of distribution network. The benefits both from the improvement of power supply reliability and operation economy should be taken into account at the planning stage. Planning model of SOPs is proposed in this paper considering the effect of connecting SOP on supply reliability and operation economy in distribution network. The fast-search and the method of finding density peaks clustering are used to aggregate the annual load data, and the typical operation scenarios in distribution network are generated to calculate the improvement cost of operation economy. The calculation method of branch failure rate based on related constraints is adopted, considering the influences of load rate of line current, node voltage and length of line on branch failure rate, the dynamic prediction failure set is generated to calculate the benefits of power supply reliability. A hybrid optimization algorithm, which combines the simulated annealing method with the second-order cone programming, is used to solve the planning model mentioned above. Finally, the effectiveness of the proposed planning model is verified by the modified PG&E 69-node test system. The results show that the SOP planning method facing reliability and economy in distribution network can effectively reduce the comprehensive cost of distribution network and maximize the investment benefits.
Keywords:distribution network  soft open point (SOP)  power supply reliability  operational economy  related constraint
本文献已被 CNKI 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号