首页 | 本学科首页   官方微博 | 高级检索  
     

杨庄矿主提升机电控系统改造
引用本文:陈根强.杨庄矿主提升机电控系统改造[J].煤炭技术,2008,27(7).
作者姓名:陈根强
作者单位:淮北矿业集团公司杨庄煤矿,安徽,淮北,235025
摘    要:通过对杨庄主提升机老TKD电控系统的现状进行分析,确定改造方案,选用JTDK-ZN-O1S交流提升机电控系统进行改造,介绍了JTDK-ZN-O1S电控系统的技术特征,闸述了改造施工中的注意事项,简单介绍了使用维护方法。

关 键 词:TKD电控系统  电控系统改造  提升机

Yangzhuang Coal Mine Host Elevator Electrically Controlled System Transformation
CHEN Gen-qiang.Yangzhuang Coal Mine Host Elevator Electrically Controlled System Transformation[J].Coal Technology,2008,27(7).
Authors:CHEN Gen-qiang
Abstract:Through carries on the analysis to the Yangzhuang host elevator old TKD electrically controlled system present situation,determined the transformation plan,selects the JTDK-ZN-O1S exchange elevator electrically controlled system to carry on the transformation,introduced the JTDK-ZN-O1S electrically controlled system technical characteristic.The floodgate has stated in the transformation construction matters needing attention,introduces the use maintenance method simply.
Keywords:TKD electrically controlled system  electrically controlled system transformation  windlass
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号