首页 | 本学科首页   官方微博 | 高级检索  
     

深卸荷变形拉裂岩体锚索预应力损失规律研究
引用本文:张金龙,徐卫亚,徐飞,蔡德文.深卸荷变形拉裂岩体锚索预应力损失规律研究[J].岩石力学与工程学报,2009,28(Z2):3965-3970.
作者姓名:张金龙  徐卫亚  徐飞  蔡德文
作者单位:(1. 河海大学 岩土力学与堤坝工程教育部重点实验室,江苏 南京 210098;2. 河海大学 岩土工程研究所,江苏 南京 210098;;3. 中国水电顾问集团 成都勘测设计研究院,四川 成都 610072)
基金项目:国家自然科学基金重点项目,国家重点基础研究发展规划(973)项目 
摘    要: 根据预应力锚索施工过程,将锚索预应力损失分为张拉损失、锁定损失和随时间的损失,并分别给出各自定义和计算公式。对锦屏一级水电站左岸边坡锚索监测资料进行统计分析,得到锚索预应力损失的分布特征。锚索预应力损失的分布特征为预应力张拉损失最大,预应力随时间的损失其次,锁定损失最小。将锦屏一级水电站左岸边坡锚索预应力损失规律与其他几个类似工程比较,得出锦屏一级水电站左岸边坡锚索预应力张拉损失明显偏大。结合锦屏一级水电站左岸边坡地质条件,分析锚索预应力张拉损失较大的原因,并提出相应改进措施。最后对锦屏一级水电站左岸边坡锚索现存荷载进行评价分析,结果表明,锚索现存荷载基本满足加固设计要求。研究结果可供其他类似工程参考和借鉴。

关 键 词:边坡工程预应力锚索预应力损失岩质边坡加固安全监测影响因素承载力
收稿时间:2009-3-30
修稿时间:2009-5-16

STUDY ON PRESTRESS LOSS LAW OF ANCHOR CABLES IN DEEP UNLOADING DEFORMED RIPPED BLOCKS
ZHANG Jinlong,XU Weiya,XU Fei,CAI Dewen.STUDY ON PRESTRESS LOSS LAW OF ANCHOR CABLES IN DEEP UNLOADING DEFORMED RIPPED BLOCKS[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(Z2):3965-3970.
Authors:ZHANG Jinlong  XU Weiya  XU Fei  CAI Dewen
Affiliation:(1. Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering,Hohai University,Nanjing,;Jiangsu 210098,China;2. Institute of Geotechnical Research,Hohai University,Nanjing,Jiangsu 210098,China;;3. Chengdu Hydroelectric Investigation and Design Institute,China Hydropower Engineering Consulting ;Group Corporation,Chengdu,Sichuan 610072,China)
Abstract:According to the construction process of prestressed anchor cable,the total prestress loss is divided into three parts,that is,tensioning prestress loss,locking prestress loss and time-dependent prestress loss. The definition and calculation formula of each part are specified. The monitoring data of prestressed anchor cables of left bank excavation slope in Jinping first stage hydropower station are analyzed systematically,and the distribution features of prestress loss are obtained. The analysis result shows that the tensioning prestress loss is the maximum component of total prestress loss of anchor cable,and the time-dependent prestress loss is the intermediate one and the locking prestress loss is the minimum one. A comparison is made between the law of cable prestress loss of left bank excavation slope in Jinping first stage hydropower station and those of some other hydropower engineering slopes. The result shows that the tensioning prestress losses of anchor cables of left bank excavation slope in Jinping first stage hydropower station are greater than those of some other hydropower engineering slopes remarkably. Based on the engineering geology of left bank excavation slope of Jinping first stage hydropower station,the factors resulting in large tensioning prestress loss are analyzed,and some measures to reduce the tensioning prestress loss are put forward. At last,the present load of anchor cables is evaluated. It is shown that the present load of anchor cables can meet the requirement of design. This result can provide references to other similar engineering.
Keywords:slope engineering  prestressed anchor cable  prestress loss  rock slope reinforcement  safety monitoring  influential factors  bearing capacity
本文献已被 万方数据 等数据库收录!
点击此处可从《岩石力学与工程学报》浏览原始摘要信息
点击此处可从《岩石力学与工程学报》下载全文