首页 | 本学科首页   官方微博 | 高级检索  
     

谈施工方如何做好市政工程竣工结算审核工作
引用本文:朱爱华. 谈施工方如何做好市政工程竣工结算审核工作[J]. 山西建筑, 2010, 36(35): 248-249
作者姓名:朱爱华
作者单位:太原市市政工程总公司第一工程公司,山西太原030009
摘    要:以太原市2008年滨河西路胜利桥立交工程竣工结算审核为例,探讨了作为一名施工方的造价员,做好市政工程竣工结算审核工作的方法,并进行了系统分析,从而为类似工程竣工结算审核提供指导。

关 键 词:市政工程  施工方  竣工结算编制

On the ways of how to deal with settlement and check in complete period for municipal projects
ZHU Ai-hua. On the ways of how to deal with settlement and check in complete period for municipal projects[J]. Shanxi Architecture, 2010, 36(35): 248-249
Authors:ZHU Ai-hua
Abstract:Taking the settlement and check in Shengliqiao overpass' s complete period of Taiyuan in 2008 as the example, the paper explores how the costs staff can deal with the settlement and check in the complete period of the municipal projects, and undertakes the systematic analy- sis, so as to provide direction for the settlement and check in the complete period of similar projects.
Keywords:municipal project   constructor   settlement and compilation in complete period
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号