首页 | 本学科首页   官方微博 | 高级检索  
     

7℃水改循环水及合成炉余热供暖技改总结
引用本文:张晓龙,尹聪.7℃水改循环水及合成炉余热供暖技改总结[J].中国氯碱,2011(5):36-37,40.
作者姓名:张晓龙  尹聪
作者单位:河北盛华化工有限公司,河北,张家口,075000
摘    要:介绍了溴化锂机组的工作原理和技改前后溴化锂机组7℃水系统、合成炉循环水、氯乙烯转化器热水的运行状况。

关 键 词:溴化锂机组  7℃冷水系统  循环水系统  热水系统  技改

Technical summarization of 7℃ water change to the circulation water and using synthetic heaters heat to heat
ZHANG Xiao-long,YIN Cong.Technical summarization of 7℃ water change to the circulation water and using synthetic heaters heat to heat[J].China Chlor-Alkali,2011(5):36-37,40.
Authors:ZHANG Xiao-long  YIN Cong
Affiliation:ZHANG Xiao-long,YIN Cong(Hebei Shenghua Chemical Co.,Ltd.,Zhangjiakou 075000,China)
Abstract:The working principle of lithium bromide unit and the operating conditions of lithium bromide chiller 7 ℃ water system,recycled water synthesis furnace,hot water vinyl converter before and after the technical transformation was described.
Keywords:lithium bromide unit  7 ℃ cooling water system  recycled water system  hot water system  technical transformation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号