首页 | 本学科首页   官方微博 | 高级检索  
     

某深基坑支护施工实践
引用本文:李方,寇立屹,李虎贞. 某深基坑支护施工实践[J]. 电力学报, 2004, 19(2): 170-172
作者姓名:李方  寇立屹  李虎贞
作者单位:山西省电力公司电力建设四公司,山西,太原,030012
摘    要:介绍了太原第二热电厂五期主厂房工程采用水泥深层搅拌桩、单管旋喷桩和素混凝土桩等综合工艺 ,形成地下连续帷幕墙 ,对原有基础进行支护和止水的施工实践

关 键 词:深基坑  支护  深层搅拌桩  单管旋喷桩  素混凝土桩
文章编号:1005-6548(2004)02-0170-03
修稿时间:2003-07-07

The Construction of the Deep Base Pit
LI Fang ,KOU Li-yi ,LI Hu-zhen. The Construction of the Deep Base Pit[J]. Journal of Electric Power, 2004, 19(2): 170-172
Authors:LI Fang   KOU Li-yi   LI Hu-zhen
Affiliation:LI Fang 1,KOU Li-yi 1,LI Hu-zhen 1
Abstract:That the main factory building's construction Taiyuan No.2 thermal electric power plant uses the comprehensive techniques of cement deep stir piles, single-tube revolving spaying piles and pure concrete piles is proposed. The underground continuous curtain wall and the construction practice of supporting and protecting the original base and stopping water is also introduced in this paper.
Keywords:deep basic pit  support and protect  deep cement mixing piles  single-tubed spiral spraying piles  pure concrete piles  
本文献已被 CNKI 维普 万方数据 等数据库收录!