首页 | 本学科首页   官方微博 | 高级检索  
     

容县电网调峰探讨
引用本文:张文忠. 容县电网调峰探讨[J]. 广西水利水电, 1997, 0(3): 61-67
作者姓名:张文忠
作者单位:广西容县水利电力局
摘    要:概述县电网负荷现状,提出调峰基本设想。以小水电为主,近期改造扩容,中期继续开发小水电,远期拟设抽水蓄能电站,规划了改造扩容的方案。

关 键 词:电力网  调峰  小水电  改造  开发

Probing into regulating the peak load of Rongxian county electric network
Zhang Wenzhong Rongxian county WREP bureau,Rongxian. Probing into regulating the peak load of Rongxian county electric network[J]. Gx Water Resources & Hydropower Engineering, 1997, 0(3): 61-67
Authors:Zhang Wenzhong Rongxian county WREP bureau  Rongxian
Affiliation:Zhang Wenzhong Rongxian county WREP bureau,Rongxian,537500
Abstract:This paper generally stated Rongxian county electric network load current condition and suggested the capital conceive of regulating the peak load. It's that put small hydropower first, in near future modify and enlarge capacity, in medium future continue develop small hydropower, and in far future construct pumped storage power station. This paper also gave the scheme of modification and enlargement capacity.
Keywords:electric power network   peak load regulation   small hydropower modification   development
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号