瀑布沟水电站大坝砾石土心墙施工监测分析
引用本文:邢新元,孙文胜.瀑布沟水电站大坝砾石土心墙施工监测分析[J].湖北水力发电,2009(4):42-45.
作者姓名:邢新元  孙文胜
作者单位:中国葛洲坝集团股份有限公司,湖北,宜昌,443002 
摘    要:瀑布沟水电站砾石心墙堆石坝,最大坝高186m,根据施工期监测砾石土孔隙水压力、土压力及沉降变形,说明在砾石土心墙施工时,必须适度地控制含水量和填筑进度。

关 键 词:砾石土心墙堆石坝  施工期监测  分析

Analysis on construction monitoring of gravel-soil core of rock fill dam of Pubugou Hydropower Station
XING Xinyuan,SUN Wensheng.Analysis on construction monitoring of gravel-soil core of rock fill dam of Pubugou Hydropower Station[J].Hubei Water Power,2009(4):42-45.
Authors:XING Xinyuan  SUN Wensheng
Affiliation:Pubugou Project Office of China Gezhouba Group Co.;Ltd.;Yichang 443002;China
Abstract:The Pubugou rock fill dam with gravel-soil core is 186 m high.According to the monitoring data on pore water pressure,soil pressure and settlement,it is worth notice that the moisture content of the gravel-soil and the construction progress of the core wall must be well controlled.
Keywords:rock fill dam with gravel-soil core  monitoring during construction period  analysis  