首页 | 本学科首页   官方微博 | 高级检索  
     

溪洛渡水电站左岸电站进水口边坡的工程地质问题
引用本文:李学权,贺溪,周德彦. 溪洛渡水电站左岸电站进水口边坡的工程地质问题[J]. 中国农村水电及电气化, 2013, 0(9): 11-15
作者姓名:李学权  贺溪  周德彦
作者单位:中国水电顾问集团成都勘测设计研究院,成都610072
摘    要:溪洛渡水电站左岸电站进水口布置在上缓下陡的斜坡上,本文对斜坡各部位岩体松驰情况逐一进行了分析,并简要介绍了处理方法。

关 键 词:溪洛渡  电站进水口  工程地质

Engineering Geological Problems of Xiluodu Hydropower Station Left Bank Station Water Intake Slope
LI Xue-quan;HE Xi;ZHOU De-yan. Engineering Geological Problems of Xiluodu Hydropower Station Left Bank Station Water Intake Slope[J]. Rural Hydropower & Electrification in China, 2013, 0(9): 11-15
Authors:LI Xue-quan  HE Xi  ZHOU De-yan
Affiliation:LI Xue-quan;HE Xi;ZHOU De-yan;( China Hydropower Engineering Consulting Group Chengdu Investigation and Design Institute, Chengdu 610072, China)
Abstract:Xiluodu hydropower station left bank water intake is arranged on the slope which is gentle on the upper portion and steep on the lower portion.The looseness conditions of the rocks on all parts of the slope are analyzed one by one,and the handling methods are briefly introduced in the paper.
Keywords:Xiluodu  power station water intake  engineering geology
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号