首页 | 本学科首页   官方微博 | 高级检索  
     

丹江口大坝加高工程闸墩预应力锚杆加固技术
引用本文:王立,胡雨新,周荣.丹江口大坝加高工程闸墩预应力锚杆加固技术[J].水利建设与管理,2014(6):9-14.
作者姓名:王立  胡雨新  周荣
作者单位:南水北调中线水源有限责任公司,湖北丹江口442700
摘    要:丹江口水库大坝加高工程是南水北调中线水源工程,此次丹江口大坝加高工程闸墩预应力加固,对大坝10个坝段和20个闸墩进行预应力加固。本文主要介绍了丹江口大坝加高工程闸墩预应力锚杆加固的施工技术。锚杆测力计的观测数据表明,预应力锚杆施工满足设计要求。

关 键 词:丹江口大坝加高工程  初期闸墩  预应力锚杆加固

Gate Pier Pre-stressed Anchor Rod Reinforcement Technology of Danjiangkou Dam Heightening Project
WANG Li,HU Yu-xin,ZHOU Rong.Gate Pier Pre-stressed Anchor Rod Reinforcement Technology of Danjiangkou Dam Heightening Project[J].Water Resources Development & Management,2014(6):9-14.
Authors:WANG Li  HU Yu-xin  ZHOU Rong
Affiliation:(South-to-North Water Diversion Project Midline Water Source Co., Ltd., Danjiangkou 442700, China)
Abstract:Danjiangkou Reservoir Dam Heightening Project belongs to South-to-North Water Diversion Midline Water Source Project. Pre-stressed reinforcement is conducted on 10 dam sections and 20 gate piers on the dam during gate pier pre-stressed reinforcement of Danjiangkou Dam Heightening Project. Construction technology of gate pier pre-stressed anchor rod reinforcement of Danjiangkou Dam Heightening Project is mainly introduced in the paper. Observation data of rock bolt dynamometer shows that pre-stressed anchor rod construction can meet design requirements.
Keywords:Danjiangkou Dam Heightening Project  early gate pier  pre-stressed anchor rod reinforcement
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号