摘    要:白石水库大坝为RCD碾压混缔造理力坝,根据设计要求和原材料的质量情况,应用填充包裹理论、正交试验等不同方法,优选配合比参数,经坝体运行和过流产,这种高掺粉煤灰的碾压混凝土质量良好,为确保工程质量,坝体施工中采用了一系列新技术和新,对夏季施工采取相应措施,同时施工单位还建立了质量保证体系。

关 键 词:碾压混凝土 配合比 施工 碾压混凝重力土坝

Roller Compacted Concrete Construction of Baishi Dam
Zhang Fengying,Ji Dexiang,Luan Min,Gao Yawei. Roller Compacted Concrete Construction of Baishi Dam[J]. Water Resources and Hydropower Engineering, 2000, 31(5): 25-27
Authors:Zhang Fengying  Ji Dexiang  Luan Min  Gao Yawei
Abstract:The Baishi Dam is a RCD gravity dam. According to the design requirements, the parameters of mix proportion were optimized by means of filling wrapping theory and cross test. It has been confirmed that the roller compacted concrete with high content flyash is good in quality. In order to assure project quality, some new techniques were adopted and the appropriate measures were taken for summer construction.
Keywords:RCC   mix proportion   construction